421 research outputs found
Ant Colony Optimization For Multiobjective Buffers Sizing Problems
International audienc
Hybrid Optimisation Method for the Facility Layout Problem
International audienc
Hybrid Job Shop and Parallel Machine Scheduling Problems: Minimization of Total Tardiness Criterion
International audienc
Implementing intelligent asset management systems (IAMS) within an industry 4.0 manufacturing environment
9th IFAC Conference on Manufacturing Modelling, Management and Control, MIM 2019; Berlin; Germany; 28 August 2019 through 30 August 2019. Publicado en IFAC-PapersOnLine 52(13), p. 2488-2493This paper aims to define the different considerations and results obtained in the implementation in an Intelligent Maintenance System of a laboratory designed based on basic concepts of Industry 4.0. The Intelligent Maintenance System uses asset monitoring techniques that allow, on-line digital modelling and automatic decision making. The three fundamental premises used for the development of the management system are the structuring of information, value identification and risk management
Production and Logistic Optimization: Parallel machines scheduling and total tardiness
International audienc
Parallel machines scheduling: Data Mining analysis for resolution methods
International audienc
Approches industriels et académiques de projet de recherche : problèmes d’ordonnancement
International audienc
A Branch-and-Bound to solve the scheduling problem Pm/r<sub>j</sub>/ΣT<sub>j</sub>
International audienceThis paper presents the first study for the total tardiness minimization on parallel machine scheduling problem with different release dates of jobs. In this problem, a set of jobs has to be scheduled, without any preemption or splitting, on identical parallel machine. Each job has a due date and a release date. A polynomial lower bound is proposed using a relaxation procedure. A set of dominance properties are also established. A branch and bound algorithm is developed by taking into account the theoretical properties, lower and also upper bounds. This exact method has been tested on a large number of randomly generated problems. The obtained results are promising
Production and logistics optimization : Parallel machines scheduling
International audienc
- …